How many single-family homes are in Vancouver?

Vancouver opened its house lots to multiplexes in 2023. Here’s how many houses there are, and how many lots have changed so far.

Rules and permits 5 min read By T-City Developments

Original analysis of City of Vancouver open data

Three-storey timber framing under scaffold during construction
A T-City build at the framing stage
Contents 12 sections
  1. What we found
  2. How old are Vancouver’s houses
  3. How many have become multiplexes
  4. What “1 in 184” looks like
  5. Four words people mix up
  6. Year by year
  7. Homes added, homes lost
  8. Why it isn’t faster
  9. How we counted
  10. What we expect next
  11. Questions
  12. Sources

About 61,700. That’s how many Vancouver lots zoned for houses had a building on them on the 2026 assessment roll: 61,126 in the R1-1 zone and 563 in First Shaughnessy. Most are detached houses, many with a suite or laneway house. Every R1-1 lot can now hold more homes, but only about 1 in 184 has a multiplex permit so far.

What we found

  • 61,700

    Vancouver house lots with a building on them, on the 2026 assessment roll: 61,126 zoned R1-1 and 563 in First Shaughnessy. Strata lots not counted.

  • 53%

    Of Vancouver’s R1-1 houses were built before 1980. 21% were built before 1940. The typical one was built in 1976.

  • 1 in 184

    Vancouver R1-1 lots with a multiplex building permit: 342 projects on 62,765 lots, to October 2, 2026.

  • 1 in 64

    R1-1 lots with a duplex or multiplex permit since January 2024: 639 duplexes and 342 multiplex projects.

  • 1.8

    New homes on permits for each house torn down in Vancouver since January 2024: about 2,990 homes against 1,632 house demolitions. Suites and laneway houses not counted.

  • About half

    Of submitted Vancouver multiplex projects have a building permit. City staff reported more than 600 submitted by May 2026; 342 had permits by October.

  • 1

    Multiplex permit that describes a rental covenant. Up to eight rental homes are allowed on a big lot, but almost every project so far is strata.

From zoned to built: where Vancouver’s multiplexes are Each step is a smaller group of the one above. Bars are not to scale
  1. 62,765Lots zoned R1-1, where a multiplex is allowed
  2. 600+Multiplex projects submitted to the City by May 2026
  3. 342Projects with a building permit by October 2, 2026
  4. ?Finished and lived in. The City doesn’t publish this yet

Lots: 2026 property tax report. Submitted: City staff, May 2026. Permits: T-City analysis of City of Vancouver open data, permits mentioning a multiplex grouped by lot

Chart: T-City Developments · tcitydevelopments.com

How old are Vancouver’s houses?

More than half of Vancouver’s houses were built before 1980 R1-1 lots with a building on them, by the year the main building was built, 2026 assessment roll
  • Built before 1940
  1. Before 1940 : 12,899
  2. 1940 to 1979 : 19,443
  3. 1980 to 2017 : 26,977
  4. 2018 or later : 1,689

T-City analysis of the City of Vancouver property tax report, 2026 roll: 61,126 R1-1 lots (not strata) with a building assessed. 118 with no year built left out

Chart: T-City Developments · tcitydevelopments.com

About 1,600 more R1-1 lots had no building assessed on the roll. Many of those are between a teardown and a new home. See how long it takes to demolish and rebuild.

How many have become multiplexes?

About 1 lot in 184. By October 2, 2026, 342 multiplex projects had building permits, holding roughly 1,200 homes. Add duplexes, and about 1 lot in 64 has a permit for more than one home since January 2024.

Many of the rest already hold more than one home. About 4 in 10 houses have a suite. See how many homes are on a Vancouver house lot.

What “1 in 184” looks like

About 1 lot in 184 has a multiplex permit Each square is one R1-1 lot. The filled square is the one with a multiplex permit

342 multiplex projects with building permits, out of 62,765 R1-1 lots on the 2026 property tax report

Chart: T-City Developments · tcitydevelopments.com

That’s about three years in. The first multiplex permit was issued in June 2024. Projects take about six months to get a permit, and a year or more to build.

Four words people mix up

Reports on Vancouver’s multiplexes often mix up these four steps. They are very different numbers:

  • Submitted: the owner has applied. Many change or drop out
  • Permitted: the City has issued the building permit. Work can start. This is what we count
  • Started: crews are on site. The City’s open data doesn’t show this
  • Finished: people can move in. The City doesn’t publish this by zone yet

A demolition permit is none of these. It means a house can come down, not that new homes will go up.

Year by year

New-home permits and house demolitions in Vancouver, 2023 to October 2, 2026
YearMultiplex projectsDuplexesNew housesLaneway housesHouses torn down
20230307284296606
202432271222399534
2025188237177365684
2026 (to Oct 2)122131111180414

Multiplexes took over from duplexes and new houses. In 2025, for the first time, there were fewer new houses than multiplex projects.

Homes added, homes lost

For each house torn down since 2024, permits added about 1.8 homes Main homes on new-building permits, against house demolition permits, January 2024 to October 2, 2026. Suites and laneway houses not counted
  • Homes added
  • Houses torn down
  1. Duplex homes (639 duplexes) : 1,278
  2. Multiplex homes (342 projects) : ~1,200
  3. New houses : 510
  4. Houses torn down : 1,632

T-City analysis of City of Vancouver open data: issued building permits to October 2, 2026. Multiplex homes: about 1,200, from the homes listed on permits (1,069 in the 301 projects that give a number)

Chart: T-City Developments · tcitydevelopments.com

About 1,600 houses came down. In the same time, permits were issued for about 3,000 main homes, plus 944 laneway houses and hundreds of suites. For where they are going up, see multiplexes by neighbourhood.

Why it isn’t faster

Three things slow it down, and all of them show up in the permits:

  • Permits take longer. The median multiplex permit took 192 days in 2026, up from 122 in 2024. See multiplex permits by the numbers
  • The math is tight. Land is expensive, and building costs are high. Many lots work better as a duplex
  • Most owners aren’t selling. A rezoned lot only changes when the owner decides to build or sell

Council asked staff in May 2026 to review the multiplex rules. That review could change what fits on a lot.

Rules checked: September 2026. Sources: VanPlex: Vancouver Motion 9, multiplex rules to be reviewed (June 2, 2026). Bylaws change, so we confirm every figure against your specific lot during feasibility.

How we counted

We used the City of Vancouver’s open data: every issued building permit to October 2, 2026, and the property tax report.

Single-family homes: lots on the 2026 assessment roll zoned R1-1 or First Shaughnessy, held as one land title (not strata), with a building assessed. A few of these hold a rental duplex or an older house split into suites. The 2020 roll, under the old zones, showed about 67,700 properties with a building.

Multiplex projects: new-building permits that mention a multiplex, grouped by lot, since a project usually gets one permit for each building. Lots: every R1-1 parcel on the 2026 assessment roll. Homes: two for each duplex, one for each new house, and about 1,200 for multiplexes, from the homes listed on permits.

  • We count permits, not finished homes. Some permitted projects will change or stop
  • Submitted projects come from City staff, not open data
  • Our October count was 339 projects. The City has since added a few permits issued before October 2

Rules checked: September 2026. Sources: City of Vancouver Open Data: Issued building permits, City of Vancouver Open Data: Property tax report (2020 and 2026 rolls), City of Vancouver: Memo to Mayor and Council on the R1-1 zone, May 29, 2025. Bylaws change, so we confirm every figure against your specific lot during feasibility.

What we expect next

  1. About 1 lot in 115 with a multiplex permit by the end of 2027, at 150 to 180 new projects a year.
  2. Duplexes keep shrinking as owners who would have built a duplex build a multiplex instead.
  3. The first real completion count once enough projects finish for the City to report it.

Sources

Every outside figure traces to one of these pages, all opened on November 2, 2026. T-City’s own analysis uses the City of Vancouver open datasets. Rates and fee schedules change, so we recheck them for your lot during feasibility.

Common questions

Questions, Answered.

How many single-family homes are in Vancouver?

About 61,700 lots zoned for houses had a building on them on the 2026 assessment roll: 61,126 in R1-1 and 563 in First Shaughnessy.

How many detached houses are in Vancouver?

About 61,700, counting house lots with a building on them. Many have a suite or laneway house, so they hold more homes than that.

How many multiplexes have been built in Vancouver?

About 342 projects had building permits by October 2, 2026, holding roughly 1,200 homes. The City doesn’t yet publish how many are finished.

How many lots in Vancouver allow a multiplex?

62,765 lots are zoned R1-1 on the 2026 assessment roll. Most allow three or four homes, and bigger lots allow up to six, or eight rentals.

What share of Vancouver lots have a multiplex?

About 1 in 184 has a multiplex building permit. Counting duplexes since January 2024, about 1 in 64.

Is Vancouver gaining homes from teardowns?

Yes. Since January 2024, permits added about 1.8 main homes for every house torn down, before counting suites and laneway houses.