Architectural drawings of a duplex spread on a desk, with the North Shore mountains through the window

Lot Feasibility Studies

What Can I Build On My Lot?

Before anyone draws anything, we find out what your land actually supports.

13 cities
Metro Vancouver to the Fraser Valley
1 day
reply to a lot check
$0
for the first lot check
25+ yrs
Family building experience

Drag to compare

See the Difference

Most former single-family lots across Greater Vancouver now allow three to six homes without rezoning. The exact number depends on lot size, frontage, distance to frequent transit and your city’s own zone. A T-City feasibility study checks all of these against current rules, then compares the options that actually fit.

After: a finished three-storey multi-unit home with grey and cedar cladding Before After
  1. 01

    Know before you design

    Zoning, frontage, site area, trees and servicing, checked before any design fees.

  2. 02

    Every option compared

    Duplex, multiplex, laneway or suite, side by side for your lot.

  3. 03

    Current rules

    Every figure checked against the city’s own bylaws, with the source.

  4. 04

    One contract

    Design, permits and construction under one contract, with the price in writing before we break ground.

Two steps

Know Before You Design

Most owners start with the free check. The full study comes when you are ready to compare options in detail.

A side-by-side duplex with cedar and black cladding, mountains behind

Free Lot Check

Send the address. We check what the zoning allows and reply within one business day.

Covers:
Zoning, lot size, frontage and transit rules.
Cost:
Free, with no obligation.
Reply:
Within one business day.
Architectural drawings of a duplex on a desk

Full Feasibility Study

Every option for your lot compared side by side, before anyone pays for design.

Covers:
Zoning, frontage, site area, trees and servicing.
Compares:
Duplex, multiplex, laneway home or suite.
Sources:
Every figure checked against the city’s own bylaws.

The details

Everything to Know Before You Build

Rules, costs and timelines, checked against each city’s own bylaws and fee schedules.

01

Why does feasibility come before design?

Because design work done against the wrong assumptions is wasted money. Owners regularly arrive with a six-unit multiplex in mind and a lot whose frontage supports four, or with a laneway house in mind on a lot where three units would produce a far better outcome. Both are avoidable with a week of proper checking.

A feasibility study establishes what is permitted, what physically fits, and what the trade-offs are between the options. Only then does drawing anything make sense.

Your lot LANE Buildableenvelope rear yardfront yard← frontage → STREET
What a feasibility study measures: frontage, depth, yards and the buildable envelope that is left.

02

How many units can I build in each city?

The province requires every city to allow at least three units on lots of 280 m² (3,014 sq ft) or less, four on lots up to 4,050 m² (1 acre), and six on lots within 400 m (1,312 ft) of a bus stop with 15-minute service. Each city then applies that through its own zone, and the differences matter.

Small-scale multi-unit housing rules in the 13 cities we build in
CityZoneUnits allowedWhat’s different
VancouverR1-13–4 from 10.0 m frontage and 306 m². 5 from 13.4 m and 464 m². 6 strata or up to 8 rental from 15.1 m and 557 m²Frontage and site area set the count. 1.00 FSR for multiplexes. Needs rear lane access
BurnabyR1 SSMUH3 up to 280 m². 4 over 280 m². 6 on 281 m² or more in a Frequent Transit Network AreaNo floor-area cap. Height, setbacks and lot coverage decide size. Tenure doesn’t change the count
RichmondRSM (S, M, L, XL)3 at 280 m² or less. 4 over 280 m². 6 within 400 m of a prescribed bus stop0.6 FAR on the first 464.5 m², 0.3 after. Six units need an affordable housing contribution. Steveston deferred to 2030
SurreyR1–R5 by lot size (most house lots R3)3 under 280 m². 4 over 280 m². 6 in a Frequent Bus Stop AreaA houseplex holds up to 4 principal units. Five and six come from coach houses and suites. New servicing rules expected October 2026
CoquitlamR-1 to R-43 at 280 m² or less. 4 on larger lots. No six-unit option: no stops currently meet the frequent-service test0.75 FAR for 3–4 homes in R-1. Parking set by home size: 1, 1.5 or 2 spaces
North Vancouver (City)Ground Oriented (GO)3 at 280 m² or less. 4 in Low Rise Neighbourhood 1. 6 in Low Rise Neighbourhood 20.85 or 1.0 FSR. 0.5 parking spaces per home. The District of North Vancouver has separate rules
New WestminsterRGO-A and RGO-B (June 2026)Up to 4 on about 1,900 RGO-A lots. Up to 6 on about 1,100 RGO-B lotsFloor area rises with homes: 0.6 FSR for 2 up to 1.0 for 5–6. Development Permit needed. No parking near frequent buses
Port CoquitlamRS1–RS43 at 280 m² or less. 4 over 280 m². 6 within 400 m of a frequent bus stop0.75 FAR for a duplex, 1.0 for a triplex. Triplexes only near frequent buses. Off-site works often $100,000 or more
DeltaRS and RD zones3 at 280 m² or less. 4 over 280 m². 6 in the Scott Road frequent transit areaA house or duplex plus suites and up to 2 garden suites or coach houses. No development permit for compliant projects
SquamishR-1 to R-5Up to 5 in R-1 and R-4, counting suites. 3 in R-3. 2 in R-2 (flood hazard areas)No floor area cap on triplexes and fourplexes. Each home up to 220 m². One parking space per main home
WhistlerHouse and duplex zones (Bylaw 2440)3 at 280 m² or less. 4 over 280 m². No six-unit optionOne or two homes must be long-term rentals, or employee housing to strata title. 0.40 FSR or 511 m² in the main zones
AbbotsfordSSMUH 1 to 43 at 280 m² or less. 4 over 280 m². More on large townhouse-zoned lotsFloor area from 0.5 for a house to 1.2 for four townhouse homes. No design permit for 4 or fewer
ChilliwackR1-A, R1-B, R1-C, R3 and others3 at 280 m² or less. 4 over 280 m², inside the Urban Growth BoundaryTwo parking spaces per home. Design permit required. Two extension areas exempt to 2030

Rules checked: September 2026. Sources: Vancouver R1-1 District Schedule (June 2026), Burnaby R1 SSMUH summary (July 2026), Richmond RSM zone, City of Surrey SSMUH zoning, Coquitlam Zoning Bylaw Part 10, City of North Vancouver GO zone handout, District of Squamish: Residential Zoning Changes, Whistler Zoning Amendment Bylaw (SSMUH) No. 2440, 2024, Abbotsford SSMUH Application Guide (January 2026), Chilliwack Small-Scale Housing Quick Guide. Bylaws change, so we confirm every figure against your specific lot during feasibility.

03

How do Vancouver’s frontage rules work on a real lot?

In Vancouver’s R1-1 zone, unit count for a multiplex is set by both frontage and site area, and a lot has to meet both. Frontage is almost always the one that decides it. The site also needs to be at least 30.4 m (100 ft) deep, have vehicle access from the rear, and sit outside the flood plain.

Vancouver R1-1 frontage thresholds, drawn to scale

Dark bars are the minimum frontage for each unit count. Light blue bars are common lot widths. Scale 0–18 m.

10.0 m · 306 m² · 3–4 units

13.4 m · 464 m² · 5 units

15.1 m · 557 m² · 6 strata or up to 8 rental

33 ft lot · 10.06 m

50 ft lot · 15.24 m

33 × 122 ft lot. The 10.06 m frontage clears 10.0 m, and 4,026 sq ft (374 m²) clears 306 m², so it allows up to 4 units. Five isn’t possible because the frontage is under 13.4 m. At 1.00 FSR the building can have up to about 4,026 sq ft of floor area, before exclusions, height and setbacks.

50 × 122 ft lot. The 15.24 m frontage clears 15.1 m, and 6,100 sq ft (566.7 m²) clears 557 m², so it allows up to 6 strata or 8 secured rental units, with about 6,100 sq ft of floor area. The west-side 5% social housing rule doesn’t apply, because the lot is under 623 m² and 17.1 m.

Two other R1-1 rules shape the outcome. A triplex is only allowed on sites up to 463 m² and 13.3 m, so larger lots go to four units or more. And a multiplex that isn’t all rental, on a site west of Ontario or Carrall Street of at least 623 m² with 17.1 m of frontage, must deliver 5% of its floor area as social housing or pay cash in lieu.

Rules checked: September 2026. Sources: Vancouver R1-1 District Schedule, s.3.1 (June 2026). Bylaws change, so we confirm every figure against your specific lot during feasibility.

04

Can I check my own lot?

Yes, and it takes about five minutes. Each city publishes a map that shows your lot’s zoning, and most show whether it sits within 400 m of frequent transit. Look up your address, note the zone and the lot dimensions, and check the transit layer. Then send us the address below and we’ll confirm what it means.

05

What does a feasibility study cover?

We look at the zoning that applies to your parcel and what the current bylaws permit outright. We measure the constraints that decide built form: frontage, site area, setbacks, floor area, height and site coverage. We check the physical realities: slope, mature trees and their protection zones, where services enter the property, lane access, and in Richmond, flood construction levels.

We also check the title for covenants and right-of-ways, and the costs each city attaches: Richmond’s six-unit affordable housing contribution, Surrey’s servicing upgrades, Vancouver’s west-side social housing rule. Then we set the options against each other: a laneway house or suite, a duplex, three to six units as a multiplex or townhome row, strata sale or secured rental. The output is a clear picture of what is possible, not a sales pitch for the largest option.

Three-storey timber framing under scaffold during construction
A T-City build at the framing stage. See our work

06

What if the answer is smaller than I hoped?

Then you have saved yourself a great deal of money and time. It is far better to find out that your frontage caps you at four units before you have paid for a six-unit design, and it is genuinely common. Frontage is the constraint owners most often overlook.

Sometimes the answer points elsewhere entirely: retaining and renovating the existing house while adding an ADU, or assembling with a neighbouring lot to clear a frontage threshold. We would rather tell you that early than discover it at permit stage.

07

What happens after the study?

If the numbers work and you want to proceed, feasibility flows straight into architectural design with our in-house team, then permits, which we manage as your representative. Interior design runs in parallel while permits are in motion. Before construction begins we set out the price and the schedule in writing.

If the numbers do not work, you stop with a clear answer and no half-finished drawings.

The journey

How We Work

A clear, step-by-step process from the first lot check to the day you get the keys.

01

Lot check & feasibility

Zoning, frontage, site area, trees and servicing, checked before any design money is spent.

A side-by-side duplex with cedar and black cladding, mountains behind01 / 06

02

Architectural design

In-house design to your zone’s rules, with suites, layout and energy needs planned from the first sketch.

Architectural drawings of a duplex on a desk02 / 06

03

Permits

Sewer and water connection permit first, then the development and building permit, with us as your representative.

Craftsman-style home at dusk with lit windows03 / 06

04

Interior design

Finishes chosen while the permit is in review, so the two run side by side.

Open-plan living room opening onto a private patio04 / 06

05

Price & schedule in writing

A quote that sets out what is included, and a schedule with a target move-in date.

Open-plan kitchen with navy cabinetry and a marble island05 / 06

06

Construction & keys

Daily photo and video updates in your client portal, inspections at each stage, then the keys.

Three-storey timber framing under scaffold on a T-City build06 / 06

The T-City promise

One Team, No Surprises.

Most delays and surprise costs start in the handoffs between a designer, a permit consultant and a builder. We keep all three with one team, and put the price in writing first.

  • Price in writing. The price and schedule are set out in writing before we break ground.

  • One contract. Design, permits and construction with one team, so nothing falls between consultants.

  • Rules checked at the source. Every zoning figure is checked against the city’s own bylaw before design starts.

  • Daily updates. Photos and video from site in your private client portal.

Questions about warranty or after-care?

Ask Our Team

“The team was professional, helpful, and easy to work with throughout the process. They paid attention to the details, communicated well, and made sure everything was done properly.”

Amolak Jawanda, Google review

Common questions

Questions, Answered.

How many units can I build on my lot?

Most former single-family lots across Greater Vancouver allow three units on lots of 280 m² or less, four on larger lots, and six near frequent transit. In Vancouver, frontage and site area set the count: 10.0 m for 3–4 units, 13.4 m for 5, and 15.1 m for 6.

Do I need to rezone?

Usually not. Provincial small-scale multi-unit housing legislation requires municipalities to permit these forms without a rezoning application in areas previously restricted to single detached housing.

What is FSR and why does it matter?

Floor space ratio sets how much building area you get relative to lot area. In Vancouver R1-1 a multiplex gets 1.00 and a duplex 0.70. Richmond uses 0.6 on the first 464.5 m² of lot and 0.3 after. Burnaby has no floor-area limit for these lots.

Does my lot qualify for six units?

Outside Vancouver, the lot usually needs to be at least 281 m² and within 400 m of a bus stop with service every 15 minutes. In Vancouver, six strata units need 15.1 m of frontage and 557 m² of site area, whatever the transit.

How do I send you my lot?

Use the lot check form on this page. The address and city are all we need. Lot size, lane access and your goals help, but we can look those up.

Ready to Start Your Project?

Send us the address. We reply within one business day, with no obligation. Or call 778-239-2078.

We reply within one business day. No obligation, no pressure. Privacy policy

Call 778-239-2078 Free Lot Check