Renovate or rebuild your Vancouver house? What the data says

What 61,095 R1-1 lots show about what an older house is worth, and what renovations and rebuilds cost.

Values and selling 4 min read By T-City Developments

Original analysis of City of Vancouver open data

Contemporary two-storey home with stone and dark timber cladding
Contents 9 sections
  1. What we found
  2. What is your house worth on paper
  3. When does renovating make sense
  4. When does rebuilding make sense
  5. How do the costs compare
  6. Is there a middle path
  7. Questions to ask before you decide
  8. Questions
  9. Sources

If your house was built before 1980, it may be worth very little on paper, because on most Vancouver lots the land holds almost all the value. That doesn’t mean you have to rebuild. A renovation costs far less and is much faster. But if the house needs major work, rebuilding can make more sense, especially as a duplex or multiplex.

What we found

We looked at every R1-1 lot on the 2026 assessment roll, and every house renovation permit since 2017:

  • 51%

    Of Vancouver R1-1 properties have a house worth less than 10% of the total. The land is the rest.

  • $37,000

    Is the median assessed value of a house built in the 1940s or 50s. The land under it is worth far more.

  • $946,000

    Is the median value of a house built from 2000 to 2019. Newer houses still hold real value.

  • $55,000

    Was the median value of a house renovation permit from 2024 to 2026. 1 in 10 was $314,000 or more.

  • 47 days

    Was the median wait for a house renovation permit in 2026. A new house took 142.

What is your house worth on paper?

Your assessment splits your property into two parts: the land and the building. For most older Vancouver houses, the building part is surprisingly small.

On half of all R1-1 lots, the house is worth less than 10% of the total, and on a third it’s less than 5%. For houses built in the 1940s and 50s, the median house is valued at just $37,000.

The typical Vancouver house built before 1980 is valued under $90,000 Median assessed value of the house alone on R1-1 lots, by year built. Right column: the house’s share of the property’s value
  • Built before 1980
  1. Before 1920 : $88K , 4.5%
  2. 1920s and 30s : $88K , 3.3%
  3. 1940s and 50s : $37K , 2%
  4. 1960s and 70s : $88K , 4.6%
  5. 1980s and 90s : $321K , 13.8%
  6. 2000 to 2019 : $946K , 30.5%
  7. 2020 or later : $1.45M , 40.2%

T-City analysis of City of Vancouver open data: property tax report, 2026 roll · 61,095 R1-1 lots with a year built · BC Assessment values as of July 1, 2025

Chart: T-City Developments · tcitydevelopments.com

A low number doesn’t mean your house is bad. BC Assessment values an old house for what it adds to a sale, and buyers of older Vancouver houses are often paying for the land. But it does tell you something useful: money spent on an old house may not raise its value much.

Rules checked: September 2026. Sources: City of Vancouver Open Data: Property tax report (2026 roll). Bylaws change, so we confirm every figure against your specific lot during feasibility.

When does renovating make sense?

  • The house is newer or solid. Built after 1980, with good bones, a dry basement and a sound roof
  • You want to stay put. A renovation lets you keep living there, or move out for a shorter time
  • The work is focused. A new kitchen, bathrooms or a suite, not the whole house
  • It’s a character house. Vancouver gives extra floor area for keeping one, and lets you add infill homes
  • You want to start soon. A renovation permit took a median of 47 days in 2026

When does rebuilding make sense?

  • The house needs major work. Foundation, roof, wiring, plumbing and windows all at once
  • It has hazards. Asbestos, old oil tanks or vermiculite insulation are costly to fix. See what demolition costs
  • You want more homes. A duplex or multiplex can turn one house into two to six homes
  • The layout doesn’t work. Low ceilings, small rooms or a dark basement are hard to fix
  • You plan to stay a long time. A new home costs less to heat and maintain for years

How do the costs compare?

Here’s what the main options cost on Vancouver permits and in our research:

Renovating, adding and rebuilding in Vancouver: costs compared
OptionTypical costMedian permit time, 2026
House renovationMedian $55,000 permit value. 1 in 10 over $314,00047 days
Add a secondary suiteMedian $71,000 permit value56 days
Add a laneway houseAbout $350,000 to $600,000 all-in99 days
Build a new houseAbout $1.0 million to $1.6 million, before land142 days
Build a duplexAbout $1.2 million to $1.73 million, before land130 days

Permit values are owners’ and builders’ estimates, so real costs usually run higher. They still show the scale clearly: even a big renovation costs a fraction of a rebuild.

Rules checked: September 2026. Sources: City of Vancouver Open Data: Issued building permits (January 2017 to October 2, 2026). Bylaws change, so we confirm every figure against your specific lot during feasibility.

Is there a middle path?

Yes. You can keep your house and add homes behind it or below it. A house can have a suite and a laneway house, which makes three homes on one lot, and you never have to move out. See adding a suite and what a laneway house costs.

If your house is a character house, Vancouver lets you add infill homes and split the old house into several homes. You keep the house you love, and add value around it.

Questions to ask before you decide

  1. How old is the house, and what shape are the foundation, roof and pipes?
  2. Do you want more homes on the lot, or just a better home?
  3. Can you move out for a year or more?
  4. How long do you plan to stay?
  5. What does your assessment say the house is worth on its own?
  6. Is it a character house the City wants to keep?

A lot check answers most of these questions. We tell you what the lot allows, and roughly what each path would cost.

How a lot check works

Sources

Every outside figure traces to one of these pages, all opened on October 19, 2026. T-City’s own analysis uses the City of Vancouver open datasets. Rates and fee schedules change, so we recheck them for your lot during feasibility.

Common questions

Questions, Answered.

Is it cheaper to renovate or rebuild in Vancouver?

Renovating is much cheaper. The median house renovation permit was $55,000 from 2024 to 2026, while a new house costs about $1.0 million to $1.6 million to build. But a rebuild gives you a new house, and can add more homes.

Why is my old house worth so little on my assessment?

Because the land holds most of the value. On half of Vancouver R1-1 lots, the house is worth less than 10% of the total. For houses built in the 1940s and 50s, the median house is valued at $37,000.

How long does a renovation permit take in Vancouver?

A median of 47 days for a house renovation in 2026, based on City permit data. A new house took 142 days.

Can I add homes without tearing down my house?

Yes. A house can have a secondary suite and a laneway house, for three homes on one lot.

When should I rebuild instead of renovate?

When the house needs major work all at once, has costly hazards like asbestos, or when you want to build more homes on the lot.